products


    the total design scale of the project is 1200 tons of domestic waste disposal per day. after the completion of the project, the annual waste disposal capacity will reach 400,000 tons, and the annual power generation capacity will be 100 million degrees. the project will deal with the domestic waste in juancheng county and its surrounding areas as a whole. the project is under construction.